spk-logo-tm-2023
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

How To Use ClearCase clearfsimport and Avoid Pitfalls

windchill features best plm software
Written by SPK Blog Post
Published on December 5, 2013

This week we will change things up a bit and have a look at an IBM/Rational ClearCase utility used for importing files into ClearCase source control. The utility command, clearfsimport, can be used to import any sort of file from a variety of other source control management (SCM) systems, or from a flat file system. It is this latter case that we will look at – importing files into ClearCase from a flat file system.

We have prepared a free document which gives information on the following kinds of issues:

  1. Example of how clearfsimport can be used correctly, and also examples of how unintended consequences can arise.
  2. How to run clearfsimport and view the results, without actually importing code or changing anything. Being able to preview a code import can save much time and trouble if something goes wrong because the import parameters are incorrectly specified.
  3. Tips on creating log files which record the import for later review.

This free document gives additional details and examples on using clearfsimport, and some of the pitfalls that can produce unexpected results.

Download this free document — and make sure to check back soon and let us know what you thought about this article!

Next Steps:

Latest White Papers

Introducing Atlassian’s Service Collection

Introducing Atlassian’s Service Collection

Are you looking for new tools that empower your teams to deliver exceptional service experiences? Atlassian’s Service Collection ensures great service for both employees and customers. What You Will Learn In the following eBook, you will discover: The tools and...

Related Resources

5 Ways to Reduce Engineering Cycle Time Without Adding Headcount

5 Ways to Reduce Engineering Cycle Time Without Adding Headcount

Key takeaways Faster engineering does not always require more headcount: Disconnected systems, manual handoffs, rework, and poor visibility often create more delays than a lack of engineering capacity. A digital thread can eliminate major sources of wasted time:...

Why Late-Stage Changes Are Killing Your Time to Market

Why Late-Stage Changes Are Killing Your Time to Market

Key Takeaways Late-stage changes get expensive fast: The farther a problem travels through design, testing, and manufacturing, the more time, cost, and rework it creates. Disconnected systems and weak traceability are major causes: When requirements, design, software,...

What CIOs Get Wrong About PLM and Digital Thread Strategy

What CIOs Get Wrong About PLM and Digital Thread Strategy

PLM and Digital Strategy for CIOs Hello, everyone, and welcome back to another SPK and Associates vlog. My name is Michael Roberts. I'm the Vice President of Sales and Marketing here at SPK and Associates. Today, we're tackling a topic that comes up consistently in...